# Phase 11-15 Master Index (Gap Closure Program)

**Date:** 2026-03-26  
**Program Window:** Phase 11 through Phase 15  
**Purpose:** Single navigation and governance index for all post-10A gap-closure planning artifacts.

---

## 1. Core Program Artifacts

- Program tracker: [docs/phase-tracker.md](docs/phase-tracker.md)
- Gap analysis baseline: [docs/business-requirement-gap-analysis.md](docs/business-requirement-gap-analysis.md)
- Gap closure roadmap: [docs/gap-closure-implementation-plan.md](docs/gap-closure-implementation-plan.md)
- Umbrella architecture baseline: [docs/wallet-implementation-plan-apps-mode.md](docs/wallet-implementation-plan-apps-mode.md)

---

## 2. Phase 11: Core Rails and Lifecycle Completion

- Execution checklist: [docs/phase-11-execution-checklist.md](docs/phase-11-execution-checklist.md)
- Sprint breakdown: [docs/phase-11-sprint-task-breakdown.md](docs/phase-11-sprint-task-breakdown.md)

Primary scope:
- Funding rails, wallet lifecycle expansion, AFEX profile sync, virtual IBAN, P2A transfer baseline, wallet PIN lifecycle, phone/QR transfer identity.

---

## 3. Phase 12: Customer Journey and Channel Completeness

- Execution checklist: [docs/phase-12-execution-checklist.md](docs/phase-12-execution-checklist.md)
- Sprint breakdown: [docs/phase-12-sprint-task-breakdown.md](docs/phase-12-sprint-task-breakdown.md)

Primary scope:
- Request money lifecycle, QR receive, beneficiary persistence and validation, card-linking and sync maturity, withdrawals and split payment, statement and receipt depth.

---

## 4. Phase 13: Compliance, Reporting, and Settlement Maturity

- Execution checklist: [docs/phase-13-execution-checklist.md](docs/phase-13-execution-checklist.md)
- Sprint breakdown: [docs/phase-13-sprint-task-breakdown.md](docs/phase-13-sprint-task-breakdown.md)

Primary scope:
- Regulatory and operational reporting, dispute lifecycle and SLA, refund workflows, GL posting and reconciliation maturity, WPS/DIFF, production notification channels.

---

## 5. Phase 14: Admin and Merchant Expansion

- Execution checklist: [docs/phase-14-execution-checklist.md](docs/phase-14-execution-checklist.md)
- Sprint breakdown: [docs/phase-14-sprint-task-breakdown.md](docs/phase-14-sprint-task-breakdown.md)

Primary scope:
- Admin completion controls, merchant onboarding and management, POS/SoftPOS/QR acceptance channels, wallet-as-payment contract baseline, inward remittance workflows.

---

## 6. Phase 15: Lending, Investments, and VAS Completion

- Execution checklist: [docs/phase-15-execution-checklist.md](docs/phase-15-execution-checklist.md)
- Sprint breakdown: [docs/phase-15-sprint-task-breakdown.md](docs/phase-15-sprint-task-breakdown.md)

Primary scope:
- Lending engine (including salary advance and BNPL), investment integrations, VAS tools, SME sub-wallet and IoT hooks, referral and campaign growth maturity.

---

## 7. Governance Review Flow

1. Start each weekly review from [docs/phase-tracker.md](docs/phase-tracker.md).
2. For each active phase, review the corresponding execution checklist first.
3. Use sprint task breakdown to validate owner assignment, dependencies, and critical-path risks.
4. Verify evidence checklist closure in each phase before changing phase status to done.
5. Record unresolved risks and carryovers in the next phase planning review.

---

## 8. Program Completion Criteria

The Phase 11-15 program is considered complete when all conditions are met:
- All phase status rows (11-15) are set to done in [docs/phase-tracker.md](docs/phase-tracker.md).
- All phase evidence checklists are fully checked.
- No critical open defects remain in scope capabilities.
- Cross-functional sign-off captured (Architecture, Security, Compliance, Operations, Product).
- Remaining gaps from [docs/business-requirement-gap-analysis.md](docs/business-requirement-gap-analysis.md) are marked closed.
