# Kuwait Prepaid Card Program — Documentation Index

**Project Branch:** `prepaid-card-system`  
**Start Date:** 2026-04-20  
**Estimated Completion:** 2026-05-20 (18–20 working days)  

---

## 📖 Read These First (In Order)

### 1. **README.md** (5 min read)
   - **What:** High-level overview of what's being built
   - **Contains:** Status, deliverables summary, next actions, success metrics
   - **Use:** Answer "what are we doing?"
   - **Go to:** [README.md](README.md)

### 2. **PHASE_TRACKER.md** (Living Document)
   - **What:** Sprint-by-sprint roadmap with detailed deliverables
   - **Contains:** 10 sprints + integration phase, tests, success criteria
   - **Use:** Day-to-day execution reference; update as sprints complete
   - **Go to:** [PHASE_TRACKER.md](PHASE_TRACKER.md)

### 3. **new_gap_analysis.md** (Requirements Reference)
   - **What:** Gap table mapping Kuwait requirements to existing code
   - **Contains:** F01-F16 (functional) + NF01-NF04 (non-functional), P0/P1 priorities
   - **Use:** Understand what's missing and why each piece matters
   - **Go to:** [new_gap_analysis.md](new_gap_analysis.md)

### 4. **kuwait-prepaid-card-proposal.md** (Technical Spec)
   - **What:** Complete technical proposal with architecture, design, and full sprint breakdown
   - **Contains:** Business context, existing capabilities, gap analysis, implementation plan, infrastructure requirements, OPEX pricing
   - **Use:** Detailed technical reference; share with stakeholders
   - **Go to:** [kuwait-prepaid-card-proposal.md](kuwait-prepaid-card-proposal.md)

### 5. **SPRINT_0_QUICK_START.md** (Action Steps)
   - **What:** Step-by-step instructions for Sprint 0 (app scaffold)
   - **Contains:** File structure, code snippets, compilation verification, checklist
   - **Use:** Get started immediately; copy-paste ready
   - **Go to:** [SPRINT_0_QUICK_START.md](SPRINT_0_QUICK_START.md)

---

## 🎯 Quick Navigation by Task

### "I'm starting Sprint 0 now"
→ Open [SPRINT_0_QUICK_START.md](SPRINT_0_QUICK_START.md)

### "I need the full sprint breakdown"
→ Open [PHASE_TRACKER.md](PHASE_TRACKER.md), find your sprint section

### "What's missing from the existing system?"
→ Open [new_gap_analysis.md](new_gap_analysis.md), look at Gap column

### "I need to explain this to stakeholders"
→ Share [README.md](README.md) for overview, [kuwait-prepaid-card-proposal.md](kuwait-prepaid-card-proposal.md) for details

### "Where are we in the project?"
→ Check [PHASE_TRACKER.md](PHASE_TRACKER.md) § Status Log (bottom of document)

### "What's the architecture?"
→ [kuwait-prepaid-card-proposal.md](kuwait-prepaid-card-proposal.md) § 5 (Wallet-as-Card Architecture)

### "What needs to be tested?"
→ Find your sprint in [PHASE_TRACKER.md](PHASE_TRACKER.md), look at Testing section

### "What databases tables do I need?"
→ [PHASE_TRACKER.md](PHASE_TRACKER.md) § Sprint 1, or [new_gap_analysis.md](new_gap_analysis.md) table schema

---

## 📊 Document Matrix

| Document | Audience | Detail Level | Update Frequency |
|----------|----------|--------------|------------------|
| **README.md** | Everyone | Overview | Static |
| **PHASE_TRACKER.md** | Developers | High | Weekly (after each sprint) |
| **new_gap_analysis.md** | Developers + PMs | High | Static |
| **kuwait-prepaid-card-proposal.md** | Stakeholders + Developers | Very High | Static |
| **SPRINT_0_QUICK_START.md** | Developers (Sprint 0) | Detailed | Used once |

---

## 🔄 Sprint Workflow

### For Each Sprint:

1. **Read** the sprint section in [PHASE_TRACKER.md](PHASE_TRACKER.md)
2. **Follow** deliverables checklist
3. **Write** code + tests per spec
4. **Run** tests (`mix test`) → 0 failures
5. **Update** PHASE_TRACKER.md status column to ✅
6. **Commit** with message: `feat/fix: <sprint>-<description>`
7. **Move to next sprint**

---

## 📝 Key Metrics (From PHASE_TRACKER)

| Item | Target |
|------|--------|
| **Total Sprints** | 10 + Integration |
| **Est. Duration** | 18–20 working days |
| **Tests** | 350+ (0 failures) |
| **New App** | `apps/wallet_prepaid` |
| **Migrations** | 6 new tables + 2 schema updates |
| **Admin LiveViews** | 8 new + 1 customer view |
| **Stores** | 4 (ETS + write-through) |
| **Commands** | 8 (with domain events) |
| **Coverage** | ~40% → 100% of requirements |

---

## 💾 Files in This Directory

```
docs/prepaid_card/
├── README.md                                   ← START HERE (overview)
├── INDEX.md                                    ← This file (navigation)
├── PHASE_TRACKER.md                           ← MAIN EXECUTION GUIDE
├── new_gap_analysis.md                        ← Requirements mapping
├── kuwait-prepaid-card-proposal.md            ← Full technical spec
├── SPRINT_0_QUICK_START.md                    ← Sprint 0 step-by-step
├── prepaid_card/                              ← (old notes, can delete)
└── ...
```

---

## 🚦 Status Dashboard

| Phase | Status | Notes |
|-------|--------|-------|
| **Gap Analysis** | ✅ Complete | 8 P0, 5 P1 gaps identified |
| **Proposal** | ✅ Complete | 10-sprint roadmap + delivery |
| **Phase Tracker** | ✅ Complete | Sprint-by-sprint details |
| **Documentation** | ✅ Complete | All guides written |
| **Sprint 0** | 🟡 Ready | Awaiting kickoff |
| **Sprint 1–10** | 🔴 Pending | Depends on S0 completion |
| **Integration** | 🔴 Pending | Final phase |

---

## ✅ Pre-Sprint 0 Checklist

Before you start Sprint 0, ensure:

- [ ] You have access to this directory (`/docs/prepaid_card/`)
- [ ] You've read [README.md](README.md) (5 min)
- [ ] You've read [SPRINT_0_QUICK_START.md](SPRINT_0_QUICK_START.md) (10 min)
- [ ] You understand the 10-sprint plan (check [PHASE_TRACKER.md](PHASE_TRACKER.md) overview)
- [ ] You know what to commit (see "git" section in SPRINT_0_QUICK_START.md)
- [ ] You have `mix` and `elixir` available

**Status:** Ready to start! 🚀

---

## 🤝 Contributing / Updating Docs

### During a Sprint:
- Update **PHASE_TRACKER.md** status log at bottom when sprint completes
- Add blockers/notes in sprint section if applicable

### After a Sprint:
- Run `mix test` and record final test count in PHASE_TRACKER
- Update success criteria (✅ or 🔴)
- Update memory file (`/memory/prepaid_project_status.md`) with status

### If Requirements Change:
- Update [new_gap_analysis.md](new_gap_analysis.md) gap table
- Update [PHASE_TRACKER.md](PHASE_TRACKER.md) affected sprint
- Note change in status log

---

## 📞 Troubleshooting

**Q: Where's the code for [feature]?**  
A: It hasn't been built yet. Check [PHASE_TRACKER.md](PHASE_TRACKER.md) to see which sprint it's in.

**Q: Do I need to read all the docs?**  
A: Start with [README.md](README.md) + [PHASE_TRACKER.md](PHASE_TRACKER.md). Others are reference.

**Q: Can I skip a sprint?**  
A: No, they have dependencies. See dependency graph in [PHASE_TRACKER.md](PHASE_TRACKER.md).

**Q: What if I find a bug in the design?**  
A: File an issue + update [new_gap_analysis.md](new_gap_analysis.md) with the correction.

**Q: How do I track my progress?**  
A: Update [PHASE_TRACKER.md](PHASE_TRACKER.md) status columns as you go.

---

**Last Updated:** 2026-04-20  
**Next Action:** Read [README.md](README.md) → [SPRINT_0_QUICK_START.md](SPRINT_0_QUICK_START.md) → Begin Sprint 0
